No. Client Description Year
01 Kabuye Sugars Works SARL, Kabuye, Jabana Sector, Rwanda Maintenance campaign of 875 kW Peterbrotherhood make steam turbo-alternator. 2016-17 2015-16
02 M/s Sudanese Sugar Co., Unit – New Halfa Sugar, Khartoum, Sudan Up-gradation of KKK make mill drive turbines from 600 KW to 750 KW ( Total – 06 nos. ) 2016-17 2015-16
03 M/s Sudanese Sugar Co., Unit – New Halfa Sugar Factory, Khartoum, Sudan Design, manufacture, testing & commissioning of 6.6 Kv, 2000A, 40 KA indoor switchboard panel with horizontal withdrawable draw out type vacuum circuit breaker with 2000A, 40 KA 3 sec electrolytic copper bussbar having bottom entry cables & each feeder with MIMIC diagram with suitable protection relay & SCADA compatible. 2016-17
04 M/s Sudanese Sugar Co., Unit – Guneid Sugar Factory, Khartoum, Sudan Design, manufacture, testing & commissioning of 6.6 Kv, 2000A, 40 KA indoor switchboard panel with horizontal withdrawable draw out type vacuum circuit breaker with 2000A, 40 KA 3 sec electrolytic copper bussbar having bottom entry cables & each feeder with MIMIC diagram with suitable protection relay & SCADA compatible. 2016-17
05 M/s Sudanese Sugar Co., Unit – Assalaya Sugar, Khartoum, Sudan.
  • Reconditioning of Peterbrotherhood make 750 kW mill turbine rotor.
  • Repair & calibration of Woodward make UG-8 governor & mastertrip.
2016-17
06 M/s Sudanese Sugar Co., Unit – Assalaya Sugar, Khartoum, Sudan. Overhauling campaign of SKODA make 13 MW steam turbo-alternator including re-engineering of critical spares. 2014-15
07 M/s Sudanese Sugar Co., Unit – New Halfa Sugar, Khartoum, Sudan Manufacture of gear box internals for KKK make CF5 steam turbine. 2013
08 CV. Kadipo Mitra Sehati, QQ. PT. Surya Mauni Teknik, JL. Rungkut Asri Barat XII/29, Surabaya, Indonesia EPC supply of Siemens make backpressure 1 MW steam turbo-alternator.
  • Inlet steam pressure : 32 kg/cmsq
  • Inlet steam temperature : 380 degC
  • Exhaust pressure : 1.5 kg/cmsq
  • Gear : Triveni, India
  • Alternator : Stamford, India
2013
09 Wonji Shoa Sugar Factory, c/o Ethiopian Sugar Corp. Nazareth, Ethiopia. Re-blading of 3,2 MW ABB make turbine rotor
  • Removal of existing blades of all 5 stages.
  • Re-engineering of new blades and manufacturing using BOHLER make blades material X22CrMoV121.
  • Fitment of new blades and shrouding.
  • Dynamic balancing of re-bladed turbine rotor as per ISO 1940, grade 1,0.
  • Re-assembly at site & commissioning.
2010
10 South Nyanza Sugar Company Limited, P.O. Box 107, Sare Awendo, Kenya. Re-blading of KKK make turbine wheel disc for model CF4 GSS :
  • Removal of all blades from Curtiss wheel.
  • Dressing of root area.
  • Re-engineering of new blades and manufacturing using BOHLER make blades material X22CrMoV121.
  • Fitment of new blades and shrouding.
  • Dynamic balancing of re-bladed turbine rotor as per ISO 1940, grade 1,0.
2012
11 M/s Sn-Sosuco, BP 13 Banfora, Burkina Faso, West Africa Refurbishing of KKK make BF4 80 boiler feed water pump drive turbine 2011
12 M/s Sudanese Sugar Co., Unit–New Halfa Sugar, Khartoum, Sudan Re-blading of Siemens make 3,0 MW steam turbine rotor. 2010
13 Bangladesh Sugar & Food Industries Corporation, Unit – Kushtia Sugar Mills, Dhaka, Bangladesh EPC supply, Supervision of erection & commissioning of co-axial gear box & new metaflex coupling for replacement of existing epicyclic gear box. 2010
14 M/s Sudanese Sugar Co., Unit – New Halfa Sugar, Khartoum, Sudan Annual maintenance of KKK make CF5 model mill drive turbines including supply of critical spares such bearings, governor, re-blading activities. Since 2002
15 M/s Sudanese Sugar Co., Unit – Guneid Sugar, Khartoum, Sudan Annual maintenance of KKK make CF5 model mill drive turbines including supply of critical spares such bearings, governor, re-blading activities. Since 2002
16 M/s Sn-Sosuco, BP 13 Banfora, Burkina Faso, West Africa Maintenance campaign of FIVES CAILS power turbo-alternators & mill drive turbines including supply of critical spares. 2011 to 2014